google-analytics-dashboard-for-wp
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/agsgnnfb/public_html/glorioustronics.com/wp-includes/functions.php on line 6121rambo
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/agsgnnfb/public_html/glorioustronics.com/wp-includes/functions.php on line 6121Electric Machines
Electric machines laboratories: 0.2 kW, 0.3 kW, 1.1 kW and 3.5 kW.
Each laboratory is composed of:
– basic autonomous benches with power supplies capable of providing all voltages, in AC or DC, fixed and variable and stabilized in order to develop a course on electrical measurements and electrical machines;
– universal bases to assemble the machines and to couple them to the other machines of the laboratory;
– motors, generators, transformers, brakes, RLC loads, instrumentation and accessories to perform any test on electrical machines.
Each electric machine is equipped with a comprehensive training manual showing all tests that can be performed at no-load and load conditions.